Multicriterial investment analysis and environmental impact on the longest suspension bridge from Romania
Închide
Articolul precedent
Articolul urmator
207 0
SM ISO690:2012
BEJUSCA, Andrei, LEPADATU, Daniel, JUDELE, Loredana, RUSU, Ion, PROASPĂT, Eduard. Multicriterial investment analysis and environmental impact on the longest suspension bridge from Romania. In: International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management: SGEM, Ed. 23, 3-9 iulie 2023, Albena. Albena: International Multidisciplinary Scientific Geoconference, 2023, Vol.23, Ediția 6.1, pp. 313-320. ISSN 13142704. DOI: https://doi.org/10.5593/sgem2023/6.1/s26.39
EXPORT metadate:
Google Scholar
Crossref
CERIF

DataCite
Dublin Core
International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management
Vol.23, Ediția 6.1, 2023
Conferința "23rd International Multidisciplinary Scientific Geoconference: Nano, Bio, Green and Space - Technologies for a Sustainable Future"
23, Albena, Bulgaria, 3-9 iulie 2023

Multicriterial investment analysis and environmental impact on the longest suspension bridge from Romania

DOI:https://doi.org/10.5593/sgem2023/6.1/s26.39

Pag. 313-320

Bejusca Andrei1, Lepadatu Daniel12, Judele Loredana1, Rusu Ion2, Proaspăt Eduard2
 
1 Technical University of Moldova,
2 Gheorghe Asachi Technical University of Iasi
 
 
Disponibil în IBN: 11 decembrie 2023


Rezumat

The process of selecting and prioritizing investment project proposals in construction is characterized by multiple objectives and uncertainties due to incomplete information and the multitude and dynamics of factors that can intervene. Knowing their significance and influence on the final investment decision, it is a complex problem that requires a multi-critical analysis with both quantitative and qualitative factors, necessary for a good quantification and evaluation. In recent years, the increase in the complexity of projects involves a large number of factors that ensure the technical and economic success of infrastructure investments and therefore it is necessary to identify the optimal decision criteria in their selection and prioritization. Identifying and setting these criteria is generally difficult and depends on the professional skills of the project manager but should follow a systematic process to ensure its validity and transparency. The paper presents such an analysis of the Braila Bridge, which crosses the Danube River and is the largest suspended bridge in Romania and the third in Europe, which required such a study in order to benefit from the best investment decision from all points of view. Thus, two design versions with multiple and varied implications of parameters are analyzed, starting from the financial or technical one with the length of the route, the difficulty of the design and execution and especially its impact on the environment and biodiversity. 

Cuvinte-cheie
environmental impact, longest investment management, multicriterial analysis