SM ISO690:2012 KALININ, Lev, ZAITSEV, Dmitrii, TÎRŞU, Mihai, GOLUB, Irina. Scenarious of moldavian power system development to merge ENTSO-E. In: Buletinul AGIR, 2012, nr. 3, pp. 651-656. ISSN 1224-7928. |
EXPORT metadate: Google Scholar Crossref CERIF DataCite Dublin Core |
Buletinul AGIR | ||||||
Numărul 3 / 2012 / ISSN 1224-7928 /ISSNe 2247-3548 | ||||||
|
||||||
Pag. 651-656 | ||||||
|
||||||
Descarcă PDF | ||||||
Rezumat | ||||||
The paper analyzes the options for the development of transport networks in Moldova in the implementation of parallel work scenarios with ENTSO-E (European Network of Transmission System Operators For Electricity) and research the feasibility and technical effectiveness of the proposed options in case of missing of synchronous work with Ukraine power system. |
||||||
Cuvinte-cheie electrical transmission line, power system interconnection, power exchange, Active and reactive power, power losses, normal mode, linie de transport a energiei electrice, pierderi de putere, schimb de putere, putere activa si reactiva, regim normal |
||||||
|