![]() RACHIER, Vasile, SOBOR, Ion. Moldova’s Wind Power Potential and Levelezed Cost of Energy. In: Sielmen: Proceedings of the 10th international conference on electromechanical and power systems, Ed. 10, 6-9 octombrie 2015, Craiova. Craiova, România: Editura ALMA, 2015, Ediția 10, pp. 543-546. ISBN 978-606-567-284-0. |
EXPORT metadate: Google Scholar Crossref CERIF DataCite Dublin Core |
Sielmen Ediția 10, 2015 |
|||||
Conferința "Sielmen" 10, Craiova, Romania, 6-9 octombrie 2015 | |||||
|
|||||
CZU: 620.92(478) | |||||
Pag. 543-546 | |||||
|
|||||
![]() |
|||||
Rezumat | |||||
three aspects concerning wind energy development in Moldova are discussed: (1) the assessment of wind power potential for the height of 100 m above ground level, using a conservative assumption of 5 MW/km2 and taking into account the main constraints, (2 ) the identification of a site in the central region of Moldova for building a 40 MW Wind Power Plant and the estimation of annual energy production, (3) levelezed cost of wind electricity assessment. |
|||||
Cuvinte-cheie wind power potential, turbine siting, annual energy production, LCOE, constraints |
|||||
|
Dublin Core Export
<?xml version='1.0' encoding='utf-8'?> <oai_dc:dc xmlns:dc='http://purl.org/dc/elements/1.1/' xmlns:oai_dc='http://www.openarchives.org/OAI/2.0/oai_dc/' xmlns:xsi='http://www.w3.org/2001/XMLSchema-instance' xsi:schemaLocation='http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd'> <dc:creator>Rachier, V.</dc:creator> <dc:creator>Sobor, I.V.</dc:creator> <dc:date>2015</dc:date> <dc:description xml:lang='en'><p>three aspects concerning wind energy development in Moldova are discussed: (1) the assessment of wind power potential for the height of 100 m above ground level, using a conservative assumption of 5 MW/km2 and taking into account the main constraints, (2 ) the identification of a site in the central region of Moldova for building a 40 MW Wind Power Plant and the estimation of annual energy production, (3) levelezed cost of wind electricity assessment.</p></dc:description> <dc:source>Sielmen (Ediția 10) 543-546</dc:source> <dc:subject>wind power potential</dc:subject> <dc:subject>turbine siting</dc:subject> <dc:subject>constraints</dc:subject> <dc:subject>annual energy production</dc:subject> <dc:subject>LCOE</dc:subject> <dc:title>Moldova’s Wind Power Potential and Levelezed Cost of Energy</dc:title> <dc:type>info:eu-repo/semantics/article</dc:type> </oai_dc:dc>