Moldova’s Wind Power Potential and Levelezed Cost of Energy
Close
Articolul precedent
Articolul urmator
756 3
Ultima descărcare din IBN:
2022-02-10 10:42
Căutarea după subiecte
similare conform CZU
620.92(478) (17)
Economics of energy in general (550)
SM ISO690:2012
RACHIER, Vasile, SOBOR, Ion. Moldova’s Wind Power Potential and Levelezed Cost of Energy. In: Sielmen: Proceedings of the 10th international conference on electromechanical and power systems, Ed. 10, 6-9 octombrie 2015, Craiova. Craiova, România: Editura ALMA, 2015, Ediția 10, pp. 543-546. ISBN 978-606-567-284-0.
EXPORT metadate:
Google Scholar
Crossref
CERIF

DataCite
Dublin Core
Sielmen
Ediția 10, 2015
Conferința "Sielmen"
10, Craiova, Romania, 6-9 octombrie 2015

Moldova’s Wind Power Potential and Levelezed Cost of Energy

CZU: 620.92(478)

Pag. 543-546

Rachier Vasile, Sobor Ion
 
Technical University of Moldova
 
 
Disponibil în IBN: 7 august 2018


Rezumat

three aspects concerning wind energy development in Moldova are discussed: (1) the assessment of wind power potential for the height of 100 m above ground level, using a conservative assumption of 5 MW/km2 and taking into account the main constraints, (2 ) the identification of a site in the central region of Moldova for building a 40 MW Wind Power Plant and the estimation of annual energy production, (3) levelezed cost of wind electricity assessment.

Cuvinte-cheie
wind power potential, turbine siting, annual energy production, LCOE,

constraints

Dublin Core Export

<?xml version='1.0' encoding='utf-8'?>
<oai_dc:dc xmlns:dc='http://purl.org/dc/elements/1.1/' xmlns:oai_dc='http://www.openarchives.org/OAI/2.0/oai_dc/' xmlns:xsi='http://www.w3.org/2001/XMLSchema-instance' xsi:schemaLocation='http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd'>
<dc:creator>Rachier, V.</dc:creator>
<dc:creator>Sobor, I.V.</dc:creator>
<dc:date>2015</dc:date>
<dc:description xml:lang='en'><p>three aspects concerning wind energy development in Moldova are discussed: (1) the assessment of wind power potential for the height of 100 m above ground level, using a conservative assumption of 5 MW/km2 and taking into account the main constraints, (2 ) the identification of a site in the central region of Moldova for building a 40 MW Wind Power Plant and the estimation of annual energy production, (3) levelezed cost of wind electricity assessment.</p></dc:description>
<dc:source>Sielmen (Ediția 10) 543-546</dc:source>
<dc:subject>wind power potential</dc:subject>
<dc:subject>turbine siting</dc:subject>
<dc:subject>constraints</dc:subject>
<dc:subject>annual energy production</dc:subject>
<dc:subject>LCOE</dc:subject>
<dc:title>Moldova&rsquo;s Wind Power Potential and Levelezed Cost of Energy</dc:title>
<dc:type>info:eu-repo/semantics/article</dc:type>
</oai_dc:dc>